Delivering Energy, Power & Infrastructure Excellence

Our team combines industry expertise and advanced technology to execute projects efficiently, safely, and sustainably.

previous arrow
next arrow
Our projects

Delivering Excellence Through Every Project

01) PROJECT NAME:

The emergency patch welding and replacement works on the NGIC pipeline at the vandalized bypass line of the Line Break Valve (LBV) Platform-C for the 14” x 17 km Alakiri–Onne Gas Pipeline Project, Nigeria.

STATUS: Completed

PROJECT SUMMARY:

Following the vandalism of the bypass line connected to the Line Break Valve (LBV) on the 14-inch x 17km Alakiri–Onne Gas Pipeline, Dieva Roka was engaged to carry out emergency patch-weld and replacement works to restore the integrity and safe operation of the pipeline system.
The scope of work involved emergency repair and restoration activities on the affected bypass line section to prevent product loss, restore pipeline integrity, and ensure the safe return of the facility to service. The project was executed by qualified personnel using appropriate equipment and in strict compliance with approved safety and engineering standards.
Dieva Roka completed the emergency repair works in line with the client’s operational objectives and industry best practices.

SCOPE OF WORK:

EMERGENCY PATCH WELDING AND REPLACEMENT WORKS

  • Identification and assessment of the vandalized/damaged section of the bypass line
  • Isolation of the affected pipeline section in accordance with approved safety procedures.
  • Surface preparation of the damaged area(cleaning, grinding, beveling).
  • Execution of patch welding on minor defects using approved WPS (Welding Procedure Specification)
  • Fabrication and installation of replacement pipe spool to match existing 14inch pipeline specifications.
  • Alignment and fit-up of replacement sections before welding.
  • Welding of joints using qualified welders in accordance with applicable codes and standards.
  • Visual inspection, liquid penetrant test, and radiography test after welding.

REPAIR OF DAMAGED TEE AND FLANGE ASSEMBLIES

  • Isolation and securing of the vandalized pipeline section
  • Removal of damaged tee fittings and flange assemblies
  • Preparation of pipe ends for installation of new components
  • Installation of new tee fittings and flange assemblies in line with design specifications.
  • Proper alignment, welding, bolting, and torqueing of flange connections
  • Replacement of gaskets and fasteners with approved materials.
  • Verification of dimensional accuracy and proper fit-up before final tightening.

TESTING AND INSPECTION

  • Conduct of visual inspection on all completed welds and installed components.
  • Performance of the leak test on the repaired carbon steel pipeline section
  • Monitoring for pressure drop and checking for any signs of leakage at weld joints, flanges and fittings.

SAFETY AND COMPLIANCE

  • All activities executed in compliance with safety procedures and the permit-to-work system
  • Use of appropriate PPE for all personnel
  • Adherence to relevant industry standard
  • Continuous monitoring to prevent hazards and ensure safe working conditions

COMMISSIONING AND DEMOBILIZATION

  • commissioning of installed systems, painting and corrosion protection, site restoration, back-loading of equipment and materials, and demobilization of personnel, equipment, and resources from the site.

02) PROJECT NAME:

Emergency erosion control works on exposed sections of Asset Operation East gas pipeline right-of-way (Lot V).

STATUS: Completed

PROJECT SUMMARY:

NNPC Gas Infrastructure Company Limited (NGIC) intends to undertake the emergency erosion control works on the exposed sections of Asset Operation East gas pipeline right of ways (Lot V) hence Dieva Roka Limited was contracted to carry out the project following the guidelines in the scope of work.

Dieva Roka Limited’s project objective was to recover the entire pipeline right of way (ROW) within the scope of work spanning the entire 25 meters width of the right of way (ROW) including the river section to effectively restore the pipeline and also protect the boundary walls against erosion.

This close-out report gives a general overview of the project, highlighting the major experiences, successes and failures, problems and solutions, and more importantly, lessons learnt with relevant recommendations where necessary for future NGIC projects. The job was executed with experienced manpower, light, and heavy equipment, and with high safety precautions and standards. Members of the project team have contributed to this report and their contributions have been included and suitably edited to retain their views on the project as much as possible.

Dieva Roka Limited mobilized both equipment and personnel to the site on the 13th of December 2024 and demobilized from the site on the 8th of March 2025 after the successful completion of the “Emergency Erosion Control Works on Exposed Sections of Asset Operation East Gas Pipeline Right of Ways (LOT V) Project. The job scope of work (SOW) involves but is not limited to the following: project documentation, site visit, material procurement, pre-mob inspection and certification of project personnel, secure FTO from the host community, Access Creation, mobilization of personnel, equipment, and materials to the site, site preparation/Set-Up, Gas testing, project scope survey activities, backfilling, excavation, installation of Geocells, Installation of Gabion Baskets, installation of Geotextiles, mark out of pipeline boundary limits, planting of Bahamas and site restoration, back-loading of equipment, demobilization of equipment/materials and personnel from the site.

Following the vandalism of the bypass line connected to the Line Break Valve (LBV) on the 14-inch x 17km Alakiri–Onne Gas Pipeline, Dieva Roka was engaged to carry out emergency patch-weld and replacement works to restore the integrity and safe operation of the pipeline system.
The scope of work involved emergency repair and restoration activities on the affected bypass line section to prevent product loss, restore pipeline integrity, and ensure the safe return of the facility to service. The project was executed by qualified personnel using appropriate equipment and in strict compliance with approved safety and engineering standards.
Dieva Roka completed the emergency repair works in line with the client’s operational objectives and industry best practices.

SCOPE OF WORK:

  • Mobilization/demobilization of plants, materials, and personnel to and from the site.
  • Site preparation, Filling, and Earthwork.
  • Provision and installation of Galvanized Gabion Basket filled with rock as a retaining structure
  • Provision and laying of geotextile material to the bottom and sides of the gabion basket
  • Provision and installation of 200mm high X 16mm thick HDPE Geocell with tension rope and anchor rod material over the right-of-way.
  • Planting of Bahamas grass and nurturing for a period of twelve (12) months
  • Post-Construction Topographic Survey.
  • Provision of two (2) Toyota Hilux vehicles.
  • Production of three (3) sets of soft and hard copies of as-built survey drawings, documents, photo albums, and drone video coverage before and after construction.
  • Reinstatement of the site environment

Before project Start

Working process

Project Completed

From Energy to Infrastructure, We’ve Got You Covered

We look forward to partnering with you and delivering excellence in the oil and gas, power sector, and building sector.

Scroll to top

You cannot copy content of this page